Technical Clarification
Extract(s) from schedule of all major standard PVC uses within the project
Technical Clarification Number
MAT7-T-OB1-0805
Guidance
2014-06-25
Page 246 ‘Extract(s) from schedule of all major standard PVC uses within the project’ can be removed provided the remaining Documentation Requirements are in order and the confirmation from contractor covers the Credit Criteria.
-----------------------------------------------------------------------------------
Technical Clarification
Quantity surveyor report and short report
Technical Clarification Number
MAT7-T-OB1-0357
Guidance
2012-01-06
This Technical Clarification is applicable to Mat-3 Reused Materials, Mat-6 Steel, Mat-7 PVC Minimisation, Mat-8 Sustainable Timber, Mat-9 Design for Disassembly, Mat-10 Dematerialisation and Mat-11 Local Sourcing.
Where the ‘Documentation Requirements’ (for Design and As Built) request a ‘Short report’ and a ‘Quantity Surveyor report’, if the ‘Short report’ is prepared by the Quantity Surveyor, it is permitted that one consolidated report satisfying both ‘Documentation Requirements’ be submitted instead of two separate documents.
Where the ‘Short report’ is not prepared by the Quantity Surveyor (e.g. green building consultant, Accredited Professional, structural engineer etc.), both the ‘Short report’ and ‘Quantity Surveyor report’ must be submitted independently.
The purpose of the ‘Quantity Surveyor report’ is to validate data (e.g. quantities, costs, Project’s contract value etc.) referenced within the ‘Short report’.
-----------------------------------------------------------------------------------
Comments