When a Daylight Modelling Report is provided including:
• legible floor plan outputs from the daylight modelling for each plan area claimed to have either a DF of not less than 2.0%, or a DI of at least 250 Lux
AND
• a summary table that identifies all spaces within the building’s UA, nominates spaces that comply and their area, identifies the DF or DI value within those spaces, and provides calculations to confirm that compliant areas jointly contribute to the claimed percentage of the UA,

then it is not required to overlay results on the architectural drawings, this requirement is specific to the hand calculation method only.

 

Erratum

Green Star SA - Office v1 Technical Manual: Page 61

Erratum Number
IEQ4-E-OB1-0648

Guidance
2013-03-14

Change the third last paragraph that reads: “Final glazing schedule identifying all glazing within the project by application, properties, supplier and quantity” to read: “Final glazing schedule identifying all glazing within the project by application and properties - including the colour, thickness, type and Visual Light Transmittance (VLT). However, where specific products are referenced on the final glazing schedule, these must be accompanied by product datasheets indicating the properties including the colour, thickness, type and Visual Light Transmittance (VLT).”

 

Erratum

Green Star SA - Office v1 Technical Manual: Page 61

Erratum Number
IEQ4-E-OB1-0453

Guidance
2012-03-14

Documentation Requirements, Description of documentation, 'Site plan extending to surrounding areas', delete "and average reflectance for those buildings".

AND

Documentation Requirements, Description of documentation, 'As built site plan drawings extending to surrounding areas', delete "and indicating average reflectance for those buildings".

 

Erratum

Green Star SA - Office v1 Technical Manual: Page 61

Erratum Number
IEQ4-E-OB1-0293

Guidance
2011-08-08

Documentation Requirements, description of documents, heading Façade drawings delete: "(drawings should preferably be isometric, not 3D)"

AND

Documentation Requirements, description of documents, heading Roof drawings delete: "(drawings should preferably be isometric, not 3D)"

 

Technical Clarification

Internal walls in Office areas

Technical Clarification Number
IEQ4-T-OB1-0276

Guidance
2011-06-01

Where internal walls within Office areas are provided as part of the ‘base building provision’ (i.e. will not change based on tenant requirements), project teams may include these within the Green Star SA submission, but should ensure they are included consistently across the submission. (E.g. these walls should be included in the IEQ-4 daylight analysis.)

 

Erratum

Green Star SA - Office v1 Technical Manual: Page 60

Erratum Number
IEQ4-E-OB1-0153

Guidance
2011-01-06

Documentation Requirements, documentation table, Design and As Built sections, change the first bullet point to read "Daylight modelling report OR short report". Delete the "OR" under the first bullet point and the delete the second bullet point which reads "Short report".

 

Erratum

Green Star SA - Office v1 Technical Manual: Page 61

Erratum Number
IEQ4-E-OB1-0154

Guidance
2011-01-06

Documentation Requirements, documentation description, under 'short report', add a fifth bullet point to read "Highlighting the size of the calculation grid used in the model."

 

 

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

Comments

Powered by Zendesk