Follow

TRA-5 LOCAL CONNECTIVITY

 

Erratum

Green Star SA - Office v1 Technical Manual: Page 188; SANS 10400 Part S

Erratum Number
TRA5-E-OB1-1517

Guidance
2016-08-05

Under documentation requirements:

Tender/ As-built Drawings are to show "Compliance with SANS 10400 Part S within the development site".

Erratum

Green Star SA - Office v1 Technical Manual: Page 187 & 188

Erratum Number
TRA-5-OB1-445

Guidance
2012-03-19

In Documentation Requirements, As Built table, delete third bullet point “Confirmation from the contractor” on page 187

AND

In Documentation Requirements, Description of documents, delete the paragraph beginning in “Confirmation from the contractor(s)…” on page 188

 

------------------------------------------------------------------------------------------------------------------------

Erratum

Green Star SA - Office v1 Technical Manual: Page 187

Erratum Number
TRA5-E-OB1-0204

Guidance
2011-01-06

Credit Criteria, last paragraph, insert "(dwellings units per hectare)" after "du/ha".

 

------------------------------------------------------------------------------------------------------------------------

Technical Clarification

Services within building targeting a certification

Technical Clarification Number
TRA5-T-OB1-0062

Guidance
2010-02-26

For the first point of the credit, for community services within 400m of a public entrance to the building, any services within the building itself may be included regardless of distance to an entrance.

 

------------------------------------------------------------------------------------------------------------------------

 

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

Comments

Powered by Zendesk