MAT-8 SUSTAINABLE TIMBER

 

Technical Clarification

Documentation requirement - timber schedule

Technical Clarification Number
MAT8-T-RC1-0354

Guidance
2012-07-26

Where a timber schedule has been produced as part of the tender documentation for the project, this timber schedule must be submitted as part of the documentation submission for this credit as per the Documentation Requirements set out in the Green Star SA – Retail Centre v1 Technical Manual.

Where the project team has not produced a timber schedule as part of the tender documentation, but all timber uses in the project as well as the proposed material for each of those uses is detailed in the Extract(s) from Specification(s), the project team may omit the submission of a timber schedule and summarise the timber uses and proposed material for each use within the summary table contained in the Short Report.

 

Erratum

Green Star SA - Retail Centre v1 Technical Manual: Page 268

Erratum Number
MAT08-E-RC1-480

Guidance
2012-04-10

On page 268 of the Retail Centre v1 Technical Manual, in the As Built column of the Documentation Requirements table, for the fourth bullet point, delete the text ‘including Chain of Custody Certificates’. The bullet point should thus simply read ‘Confirmation from contactor’

 

 