MAT-10 DEMATERIALISATION

 

Erratum

Green Star SA - Retail Centre v1 Technical Manual: Page 279

Erratum Number
MAT10-E-RC1-0294

Guidance
2011-08-08

Documentation Requirements, Description of Documentation, Quantity Surveyor report: replace paragraph with: “Quantity Surveyor report establishing the reference case against which the reduction in steel, concrete and reinforcing/stressing steel, timber, ductwork or piping will be measured. The report must identify the expected, standard practice scenario for the amount of the relevant material.”

 

Erratum

Green Star SA - Retail Centre v1 Technical Manual: Page 279

Erratum Number
MAT10-E-RC1-0177

Guidance
2011-01-06

Documentation Requirements, Documentation Table, Design section: under "Where finishes are minimised:", add a third bullet point to read "Tender Drawings".

 

Erratum

Green Star SA - Retail Centre v1 Technical Manual: Page 279

Erratum Number
MAT10-E-RC1-0178

Guidance
2011-01-06

Documentation Requirements, Documentation Table, As Built section: under "Where finishes are minimised:", add a fifth bullet point to read "As Built Drawings".

 

Erratum

Green Star SA - Retail Centre v1 Technical Manual: Page 280

Erratum Number
MAT10-E-RC1-179

Guidance
2011-01-06

Documentation Requirements, Description of Documentation: under "Tender/As built drawings:" the second bullet point, replace the full stop at the end of the sentence with "; and". Also, add a third bullet point to read "Drawings marked up to show, and quantify associated areas where dual-function cladding is installed.

 

 