MAT-6 STEEL

Technical Clarification

Statement of Confirmation (2) 

Erratum Number
MAT6-E-PB1-1642

Guidance
2016-11-21

In the PEB v1 tool under the Mat-6 Steel credit replace the wording in Statement of confirmation (2) in the Documentation Requirements section with the following: 'Statement of confirmation (2) from the Contractor in the form of signed correspondence, clearly demonstrating the total quantity of the actual steel used in the project. Where targeting the credit as Not Applicable the contractor must include material value of actual steel used in the project as a percentage of the project’s contract value.' 

____________________________________________________________________________

 

Technical Clarification

Statement of Confirmation (1) when no contractor appointed in Design

Technical Clarification Number
MAT6-T-PB1-904

Guidance
2015-04-14

The project team’s proposal for not providing Statement of Confirmation requirement is conditionally approved.

The GBCSA provides the following clarification in this regard:
The project team is to provide a Short Report (for Design only) demonstrating how the Project Team is using the Tender Specifications to meet the Credit Criteria to meet the manufacturer(s) and/ or suppliers information.

 

 