EMI-8 LEGIONELLA

 

Technical Clarification

Documentation Requirements

Technical Clarification Number
EMI8-E-PB1-0808

Guidance
2015-07-15

On page 384 of the Green Star SA - Public and Education Building v1 Technical Manual, under the Documentation requirements, description of documents, add “ As built drawing(s) of the HVAC system, with components clearly nominated.

On page 384 of the Green Star SA - Public and Education Building v1 Technical Manual, under the Documentation requirements, description of documents, add “Extract(s) from the Commissioning Records demonstrating that the HVAC system(s) where present have been commissioned and found to operate as intended by the design.

Technical Clarification

Legionella and 'Shell & Core' spaces

Technical Clarification Number
EMI8-T-PB1-0712

Guidance
2013-07-22

The following guidance is provided for spaces delivered as ‘Shell & Core’, as defined in the Green Star SA PEB v1 Technical Manual.

Regardless of delivery type (i.e. Conventional, Integrated or Shell & Core), the scope of the credit criteria is applicable to water-based heat rejection system(s) that have been provided serving the building’s nominated area.

 

 