Erratum
Green Star SA - Retail Centre v1 Technical Manual: Page 208
Erratum Number
WAT2-E-RC1-0432
Guidance
2012-03-14
Documentation Requirements, Description of documentation, under Extract(s) from the specification(s) replace with "listing the major water uses within the project and stipulating their sub-metering requirements; indicating water meters are to be connected to the automated monitoring system (e.g. BMS) and decribing the functionality of the monitoring system (including the alert function)."
Comments