Erratum
Green Star SA – Retail Centre v1 Technical Manual: Page 299
Erratum Number
ECO1-E-RC1-0544
Guidance
2012-08-22
Documentation Table, Design and As Built Columns, add second bullet point Extract(s) from contracts
AND
Documentation Requirements, description of documents, under Short report(1), delete last bullet point
AND
Documentation requirements, description of documents, add “Extract(s) from contract(s) clearly demonstrating the requirements for topsoil management that the contractor and sub-contractors must adhere to in order to achieve compliance with the Credit Criteria”.
Technical Clarification
Miscellaneous topsoil
Technical Clarification Number
ECO1-T-RC1-0106
Guidance
2010-10-13
Topsoil contained within non-permanent landscape, such as potted plants, planter boxes, or other non-insitu landscape features, which can be removed or relocated, is not considered part of the ‘site’ and is therefore not within the scope of the Eco-1 Topsoil credit. All other topsoil, including that contained in permanent or insitu landscape features, must be included in calculations demonstrating compliance with the credit criteria.
Comments