Follow

ENE-5 MAXIMUM ELECTRICAL DEMAND REDUCTION

 

Erratum

Documentation requirements for “As-built Drawings” under Credit Ene-5 Maximum Electrical Demand Reduction are not included in the PEB V1 Technical Manual.

Erratum Number
ENE5-E-PB1-0807

Guidance
2014-07-08

Errata On page 174 of the Green Star SA - Public and Education Building v1 Technical Manual, under the Documentation requirements, description of documents, add “ As built drawing(s) of the installed solution(s).

 

 

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

Comments

Powered by Zendesk