Erratum
Accredited Professional
Erratum Number
MAN-1-T-EBP1-4238
Guidance
On Page 31, under "Documentation Requirements" table , under "Documentation" add:
Complete and upload submission template from the Certification Engine.
-------------------------------------------------------------------------------------------------------------------
Technical Clarification
Accredited Professional
Erratum Number
MAN-1-T-EBP1-991
Guidance
The GBCSA notes that it is acceptable to register a project and submit Round 1 before attaining the Green Star SA Accredited Professional – Existing Building Performance status. Project teams will need to demonstrate that the conditional requirement is met prior to submitting Round 2 and provide the proof of AP qualification in the round 2 submission. This ruling is valid until end of June 2016.
Comments