MAT-2.2 - Waste Stream Audit of Ongoing Consumables and development of an Operational Waste and Materials Management Plan
Erratum Number
MAT02-E-EBP1 -7179
2025-07-18
Reference document attached: Green Star EBP - Waste Stream Audit Protocol
Guidance:
1. Where the technical manual states that "Where possible this can be done by the waste management contractor provided that the data is directly linked to the project building...", this means that while the waste management contractor can carry out the audit in terms of the credit requirements, the data must be linked to the project building, meaning the data cannot be an extrapolation of general waste stream data from an external sorting facility.
2. Where the TM states "where no accurate waste stream data can be obtained from waste management contractors, the waste audit must be carried out on site..." this means in the case where the waste management contractor cannot provide waste stream data of waste contained in general waste, an audit must be carried out on site.
3. Only where 100% of all waste generated on site is diverted from landfill, ie where the project does not send any waste to landfill, can the waste stream data be considered accurate and a waste stream audit would not be necessary. Where less than 100% of all waste generated on site is diverted from landfill, a once-off full waste stream audit is a necessity to establish appropriate plans and strategies.
_________________________________________________
Erratum Number
MAT02-E-EBP1 -3447
Guidance
2020-11-20
Where project team(s) wish to claim the Waste to Landfill Diversion: Moveable and/or Electronic Goods as Not Applicable due to no moveable or electronic goods being disposed of during the project performance, the following documentation requirements are required:
Under Documentation Requirements add:
- Provide a letter from the Facilities Manager or Waste Contractor that there was no moveable or electronic goods during the performance period.
_________________________________________________
Erratum
Solid Waste and Materials Management Policy
Erratum Number
MAT02-E-EBP1 -1989
Guidance
2017-07-21
In the credit criteria table for the Solid Waste and Materials Management Policy remove the sentence and 4 bullets listed;
"including, at a minimum the following:
· Ongoing Consumables,
· Hazardous Materials,
· Movable and Electronic Goods and
· Construction Waste from Churn and Alteration"
As the above 4 bullets are already listed/described in the Credit Criteria description under the subheading.
Erratum
Waste to Landfill Diversion Construction Waste: Churn and Alterations claiming the point as Not Applicable
Erratum Number
MAT02-E-EBP1 -1807
Guidance
2017-03-29
Where project team(s) wish to claim the Solid Waste Management, Waste to Landfill Diversion Construction Waste Churn and Alterations as Not Applicable due to no churn or alterations taking place during the performance period,
Under Documentation Requirements add:
- Provide a letter from the Facilities Manager or Waste Contractor that there was no construction waste during the performance period.
_________________________________________________
Erratum
Mat 2: Solid Waste Management, Waste Stream Audit of Ongoing Consumables, Operational Waste and Materials Management
Plan (OWMMP)
Erratum Number
MAT02-E-EBP1 -1601
Guidance
2016-11-15
Under Credit Criteria, within the Operational Waste and Materials Management Plan table A, remove 'Identify the areas to which the OWMMP applies. For instance in a shopping centre, some shops may be responsible for their own waste management. Where this is the case, this must be clearly identified within the OWMMP.' and replace 1. Scope with the following: 'Results of the waste stream audit which are used as the base for the OWMMP must be included within the OWMMP. Identify the areas to which the OWMMP applies. For instance in a shopping centre, some shops may be responsible for their own waste management. Where this is the case, this must be clearly identified within the OWMMP.'
ERRATUM
Waste to Landfill Diversion: Operational waste and materials
Points allocation for percentages
Erratum Number
MAT-2-E-EBP1-0001
11 August 2014
Guidance
The GBCSA the following under Credit Criteria:
Up to 3 points are awarded where the following percentages (by
mass or volume) of operational waste and materials are diverted
from landfill during the performance period*:
25% = 1 point
50% = 2 points
75% = 3 points
ERRATUM
Solid Waste & Materials Management Policy
Erratum Number
MAT-2-T-EBP1-1169
16 November 2015
Guidance
- On the second page of the Mat-2 credit (2nd paragraph) is states that the policy needs to be put in place prior to the start the project's and be throughout the performance period.
Change the wording to the below:
A Solid Waste and Materials Management Policy, must be developed and adopted/approved during the performance period.