Follow

MAT-2 SOLID WASTE MANAGEMENT

Erratum

Solid Waste and Materials Management Policy

Erratum  Number
MAT02-E-EBP1 -1989

Guidance
2017-07-21

In the credit criteria table for the Solid Waste and Materials Management Policy remove the sentence and 4 bullets listed;

"including, at a minimum the following:

· Ongoing Consumables,

· Hazardous Materials,

· Movable and Electronic Goods and

· Construction Waste from Churn and Alteration"

As the above 4 bullets are already listed/described in the Credit Criteria description under the subheading.

Erratum
Waste to Landfill Diversion Construction Waste: Churn and Alterations claiming the point as Not Applicable

Erratum  Number
MAT02-E-EBP1 -1807

Guidance
2017-03-29

Where project team(s) wish to claim the Solid Waste Management, Waste to Landfill Diversion Construction Waste Churn and Alterations as Not Applicable due to no churn or alterations taking place during the performance period,

Under Documentation Requirements add: 

  • Provide a letter from the Facilities Manager or Waste Contractor that there was no construction waste during the performance period.

_________________________________________________

Erratum

Mat 2: Solid Waste Management, Waste Stream Audit of Ongoing Consumables, Operational Waste and Materials Management
Plan (OWMMP)

Erratum Number
MAT02-E-EBP1 -1601

Guidance
2016-11-15

Under Credit Criteria, within the Operational Waste and Materials Management Plan table A,remove 'Identify the areas to which the OWMMP applies. For instance in a shopping centre, some shops may be responsible for their own waste management. Where this is the case, this must be clearly identified within the OWMMP.' and replace 1. Scope with the following: 'Results of the waste stream audit which are used as the base for the OWMMP must be included within the OWMMP. Identify the areas to which the OWMMP applies. For instance in a shopping centre, some shops may be responsible for their own waste management. Where this is the case, this must be clearly identified within the OWMMP.' 

ERRATUM

Waste to Landfill Diversion: Operational waste and materials
Points allocation for percentages

Erratum Number
MAT-2-E-EBP1-0001

11 August 2014

Guidance

The GBCSA the following under Credit Criteria:

Up to 3 points are awarded where the following percentages (by
mass or volume) of operational waste and materials are diverted
from landfill during the performance period*:
25% = 1 point
50% = 2 points
75% = 3 points

ERRATUM

Solid Waste & Materials Management Policy

Erratum Number
MAT-2-T-EBP1-1169

16 November 2015

Guidance

  • On the second page of the Mat-2 credit (2nd paragraph) is states that the policy needs to be put in place prior to the start the project's and be throughout the performance period. 

Change the wording to the below:

A Solid Waste and Materials Management Policy, must be developed and adopted/approved during the performance period.

 

 

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Submit a request

Comments

Powered by Zendesk