Follow

TRA-1 ALTERNATIVE TRANSPORTATION

Erratum

Additional point Improved Transportation: Modes Performance Improvements on Baseline as Not Applicable

Erratum  Number
TRA01-E-EBP1 -2005

Guidance
2017-08-04

Where project team(s)  undertaking Existing Building Performance Certification for the first time may claim this additional point, as Not Applicable during the performance period, 

Under Credit Criteria add the wording " however, project teams may not claim NA if the credit is not targeted i.e Transportation modes survey"

______________________________________________

Erratum

Additional point Improved Transportation: Modes Performance Improvements on Baseline as Not Applicable

Erratum  Number
TRA01-E-EBP1 -1965

Guidance
2017-07-07

Where project team(s)  undertaking Existing Building Performance Certification for the first time may claim this additional point, as Not Applicable during the performance period, 

Under Documentation Requirements add: 

  • Provide a letter from the Building Owner/ Representative or Facilities Manager confirming that this is the first EBP certification.

______________________________________________

TECHNICAL CLARIFICATION

Transportation Modes Survey, Sample Size and Green Travel Plan (GTP)

TC Number
TRA1-E-EBP1-1481

Guidance

2016-08-12

Transportation Modes Survey:
In order to achieve 1 point for Transportation Modes Survey, project teams must comply with all of the credit criteria per the Technical Manual, including the Transportation Modes Survey, Population and Sample Size sections of the credit criteria, and where the qualitative & detailed surveying is done and the correct sample size is achieved.
(The Transportation Modes Survey must be structured in a way that respondents can provide detail of their commute pattern over the full week period and must provide the opportunity for qualitative answers.)

Green Travel Plan (GTP) - Regular Occupants and Visitors:
In order to achieve the points for the GTP the project teams must comply with all the credit criteria per the Technical Manual, including the survey results from the Transportation Modes Survey & the status quo are required to be detailed within the GTP.
(The Transportation Modes Survey must be structured in a way that respondents can provide detail of their commute pattern over the full week period and must provide the opportunity for qualitative answers.)

_________________________________________________________

ERRATUM

Sample size for survey & Green Travel Plan

Erratum Number
TRA-1-T-EBP1-1221

Guidance

2016-02-03

Transportation survey sample size

Delete "75%" insert "51%"

Survey Responses needed for 95% Confidence
Population Size          Responses Needed for 10% Margin of Error(Sample Size)
<100 51

AND

Green Travel Plan for Regular Occupants & / OR Visitors

Insert
1) After all elements of the Green Star SA Policy and Programme/Plan Model  insert "see additional guidance"
2) After sentence Develop and implement a Green Travel Plan (GTP) that is specifically tailored to the project building(s) and its/their location  .....  "The plan must include a strategy to promote at least 3 Alternative Transportation Options for the building. See additional Guidance for a menu of alternative transport options."
3) Under Additional Guidance insert following as per TCE GEN-1-E-EBP1-1139

 

TECHNICAL CLARIFICATION

Transportation modes survey

TC Number
TRA-1-T-EBP1-1190

Guidance

2015-11-25

The following guidance is given regarding how many surveys may be done in order to achieve the required sample size;

One survey result is required for the transportation modes survey in order to eliminate any repetition to achieve the required sample size as per table TRA-1.1 Sample Size Determination. 

If the survey does not achieve the minimum amount it may be redone or reissued as many times in order to achieve the required sample size within the performance period BUT the results cannot be combined to achieve the required sample size.

Was this article helpful?