Man-15 Maintainability, Documentation Requirements

Erratum Number

MAN15-E-PB1-1573

Guidance

2016-09-28

Remove ‘Preliminary design review report’ from the document requirements listed for the As-built stage.

 

Technical Clarification

Design Stage Building Maintenance Guide

Technical Clarification Number
MAN15-T-PB1-1219

Guidance
2015-12-23

The GBCSA acknowledges that not all fabrics, surfaces, services, systems and controls may be fully known for the Design stage submission with regards to completing the Building Maintenance Guide​. ​

​For the Design stage submission the Building Maintenance Guide​ can state 'element not yet known' or 'still to be determined' for materials/areas that are not known at the Design stage​. The fully completed Building Maintenance Guide​ is still required for the As Built submission.