IEQ-2 LIGHTING COMFORT

 

Technical Clarification

Tenant Guidelines

Erratum Number
IEQ2-T-EBP1-1817

Guidance

24-03-2017

Note any points targeted will not be awarded unless a Tenant Guideline Document and adherence of the credit requirements laid out in the TM are submitted. Project teams need to provide evidence if all areas are under building management control and therefore a Tenant Guideline Document does not need to be submitted. 

------------------------------------------------------------------------------------------------------------------------

 

Technical Clarification

Tenant Guidelines

Erratum Number
IEQ-2-T-EBP1-1680

Guidance

APPLICABLE TO ALL PROJECTS REGARDLESS OF DATE OF REGISTRATION

Where certain areas are not under the control/specified by of the building management team (in this case lighting installations) the following still applies and requires to be submitted for the credit to show that the credit criteria have been satisfied:

 A tenant guideline document* must be issued which details the following:

  • Recommendations for installing high-frequency ballasts in workstation areas
  • Recommendations for lighting levels in line with the credit criteria in order to address eye-strain in workstation areas.

*Note that projects may choose to include the required tenant guidelines in the Building User Guide as per Man-3 Building Management however the specific requirements laid out above are to be clearly highlighted to show compliance. 

 --------------------------------------------------------------------------------------------------------------------

 

ERRATUM

Erratum  Number
IEQ-4-E-EBP1-1178

Guidance

2016-01-21

1. Under Table 1 Remove words "minimum lux levels in office areas must be equal to"
Add "SANS 10114-1 recommends"

2. Documentation requirement section

Lighting comfort from alphabet letter o replace with number 0 so that points read 0.5

3. Delete and Remove TABLE 2 General Building Area lux levels (1) 

  --------------------------------------------------------------------------------------------------------------------

ERRATUM

Fluorescent ballast audit

Erratum  Number
IEQ-4-E-EBP1-1178

Guidance

2016-01-21

visual audit must be undertaken*
Add description:

* Where it can be confirmed that all lighting installations in the building were installed after 1 January 2010, a Fluorescent Ballast Audit is not required for the building. Instead, a signed confirmation from the building owner or facilities manager should be submitted confirming that all lighting installations were installed after 1 January 2010 and that all fluorescent lighting within occupied areas employs high-frequency ballasts.

 

 

Was this article helpful?