Technical Clarification
Definition of ‘extended period of time'
Erratum Number
IEQ-3-T-EBP1-2352
Guidance
2018-07-05
The GBCSA will accept the Interiors Tool description that ‘where a person is expected to work for a period longer than one continuous hour per day’ is equated in the EBP Technical Manual to ‘a space where a person is expected to work, or remain for an extended period of time’ and is a REGULARLY OCCUPIED SPACE.
The further definition/words in the Interiors Occupied Space (OS) don’t apply to the EBP Tool and the definitions with in the EBP Technical Manual as well the definitions within each credit should be taken into account when understanding and defining what REGULARLY OCCUPIED SPACE is for that specific credit.
-------------------------------------------------------------------------------------------------------------
Technical Clarification
Tenant Guidelines
Erratum Number
IEQ3-T-EBP1-1817
Guidance
24-03-2017
Note any points targeted will not be awarded unless a Tenant Guideline Document and adherence of the credit requirements laid out in the TM are submitted. Project teams need to provide evidence if all areas are under building management control and therefore a Tenant Guideline Document does not need to be submitted.
--------------------------------------------------------------------------------------------------------
Technical Clarification
Tenant Guidelines
Erratum Number
IEQ-3-T-EBP1-1680
Guidance
APPLICABLE TO ALL PROJECTS REGARDLESS OF DATE OF REGISTRATION
Where certain areas are not under the control/specified by of the building management team (in this HVAC installations) the following still applies and requires to be submitted for the credit to show that the credit criteria have been satisfied:
A tenant guideline document* must be issued which details the following:
- Recommendations for measurement and control of temperature in the occupied spaces
- Recommendations for conducting occupant comfort surveys with respect to thermal comfort
*Note that projects may choose to include the required tenant guidelines in the Building User Guide as per Man-3 Building Management, however the specific requirements laid out above are to be clearly highlighted to show compliance.
Comments