ENE-2 PEAK ELECTRICITY DEMAND

Clarification

New Normal for Office Spaces 

Erratum Number
ENE-1-E-EBP1-5375

 

Clarification

OFFICE projects are required to follow the following guidance if they are impacted by either:

  1. ‘remote work’ and/or ‘hybrid work’, or
  2. Performance periods, including ENE-2: Peak Electricity Demand

 

Guidance

Please see guidance attached below (New Normal for OFFICES) for OFFICE projects impacted by POST-COVID / HYBRID-WORKING conditions

  • ENERGY & WATER PERFORMANCE PERIODS (ENE-1, ENE-2 & WAT-1)
  • NORMALISING FOR REDUCED OCCUPANCY DENSITY DUE TO HYBRID-WORKING

-------------------------------------------------------------------------------------------------------------------

Erratum Number

ENE2-E-EBP1-1987

Guidance

2017-07-20

Documentation requirements remove the Note: "The item above need only be provided if not enclosed as part of MAN-6 credit submission."

Replace: where documentation is cross referenced, please highlight and bookmark accordingly within the credit.  Assessors/Moderators will/may not always have access to all the credits in a submission as it may be split.

________________________________

Erratum Number

ENE2-E-EBP1-1624

Guidance

2016-10-19

ENE-2 Historical Data Input Calculator corrected.

See below

New calculator is called GSSA_EBP_V1_Calculator_201610_Rev_4